Month-end cost check
- Does
- Explains each month’s cost drift and links every driver to its ledger lines.
Every run
- Split the month’s cost change by item.
- Compare it with the last 12 months.
- Link every driver to its ledger lines and post a summary.
- When
- Monthly · last working day, 18:00
- Starts
- On its own
Latest post · week 41 · Energy and outsourced transport explain 90% of the 3% cost drift. Each driver links back to the ledger lines behind it.
Shared with the finance team